Unite States’ import demands require infrastructure upgrade at our shipping and receiving ports. Fairfield Marine Terminal, in Baltimore, is no exception. This project required advanced water management, due to its elevation, and high mast lighting. With a project budget of approximately $6.3M, this parking facility will open a large area for automobile and farm equipment staging and delivery.

9.6 acres of disturbed area including:

  • Site demolition
  • Mass grading
  • Stormwater Management
  • Utilities and utility demolition
  • Site concrete
  • High Mast Site Lighting
  • Fencing
  • Asphalt Paving
  • Striping and Signage
  • Mechanized gated entry
  • Security checkpoint